Jack-up Installation, Operation and Transportation



Date: Tuesday, October 16, 2018 from 01:00 pm to 04:00 pm

Value of Attending 
Gain an overview of the various factors which can influence the successful operation of oil and gas jack-ups, including their installation, elevated operation and transportation between locations, together with the processes undertaken for Marine Warranty Surveyor approvals. 

Seminar Content
  • Jack-ups and their key features
  • Certificates of Approval
  • Standards, guidelines and best practice
  • Information required for Certificates of Approval
  • The site-specific assessment analysis
  • Seabed geology, soil types and geotechnical site investigations
  • The installation process and preloading
  • Spudcan penetration responses
  • Rack Phase Differences (RPDs)
  • Seabed hazards
  • Spudcan extraction
  • Case studies
  • Wet tows and dry transportations
  •  

Lecturer

  • Mike White,  Principal Engineer,  DNVGL Noble Denton Marine Services, Houston